RSS

Tag Archives: BWCA

Gunflint & Lake Superior Railroad I

This week we are switching our focus from the PAD&W to the Gunflint & Lake Superior Railroad. The G&LS was a logging line that was operated by the Pigeon River Lumber Company from 1902-1909. While not part of the PAD&W, it branched from the railway at Milepost 79 and was an important source of business.

This episode covers the section of the G&LS from its junction with the PAD&W to the International Boundary. This piece of line lies entirely within Ontario and features several embankments and cuts.

Advertisements
 
Leave a comment

Posted by on January 28, 2019 in Hiking, History, Railway, Video

 

Tags: , , , , ,

Paulson Mine, Minnesota 2012

This week’s episode of our YouTube tour of the PAD&W takes us to the end of the line, the Paulson Mine, MN (MP 91). After passing through yet another switchback, the line turns east and terminates at the site of this prospective iron mine. Unfortunately the company that owned the mine went bankrupt in 1893 and it closed without shipping any ore. Attempts were made to re-open it until the 1920s, but none were successful.

 
Leave a comment

Posted by on January 23, 2019 in Hiking, History, Railway, Video

 

Tags: , , , , , ,

PAD&W Railway of Minnesota 2014 I

This week’s episode of our YouTube tour of the PAD&W takes us to the section of line near Round Lake, MN (MP 89.5). We return to the northern face of the ridge from the last episode, passing through the dark 300-foot rock cut again, before making our way along yet another cut, this one shorter, but cut directly into the side of the ridge. We view both sides of a 400-foot trestle, which towers nearly 100 feet above the adjacent valley. The views along the sheer cliffs are spectacular.

 
Leave a comment

Posted by on January 16, 2019 in Hiking, History, Railway, Video

 

Tags: , , , , , ,

PAD&W Railway of Minnesota 2013 III

This week’s episode of our YouTube tour of the PAD&W takes us to the section of line near Round Lake, MN (MP 89.5). After looping around a small lake and going through a double-trestle switchback, the grade continues to ascend along the northern face of a ridge. The engineering work is again heavy, with several cuts, a high embankment and a long, dark 300-foot rock cut. The views are spectacular.

 
Leave a comment

Posted by on January 10, 2019 in Hiking, History, Railway, Video

 

Tags: , , , , , , ,

PAD & W Railway of Minnesota 2013 II

This week’s episode of our YouTube tour of the PAD&W takes us to the section of line near Round Lake, MN (MP 88.5). After following the valley of the Cross River for a mile and a half, the railway now had to climb 200 feet in a very short distance to reach the Paulson Mine. Railway engineers looped the grade around a small lake before ascending into a double-trestle switchback.

 
Leave a comment

Posted by on January 4, 2019 in Hiking, Railway, Video

 

Tags: , , , , , , ,

PAD&W Railway of Minnesota 2013 I

This week’s episode of our YouTube tour of the PAD&W takes us to the section of line near Round Lake, MN (MP 88.5). After following the valley of the Cross River for a mile and a half, the railway now had to climb 200 feet in a very short distance to reach the Paulson Mine. Railway engineers looped the grade around a small lake before ascending into a double-trestle switchback.

 
Leave a comment

Posted by on December 27, 2018 in Hiking, History, Railway, Video

 

Tags: , , , , ,

PAD&W Railway of Minnesota 2012

This week’s episode of our YouTube tour of the PAD&W takes us to the section of line west of Gunflint Narrows (MP 85.5). After crossing the international boundary on a high trestle, the railway continued along the shore of Gunflint Lake in Minnesota. The grade was blasted out of sheer cliffs in many places, creating some very high, lengthy rock cuts. As one could imagine, the cost of construction in the area was immense.

 
Leave a comment

Posted by on December 18, 2018 in Hiking, History, Railway, Video

 

Tags: , , , , , ,