Flett Stream Tunnel
Flett Tunnel Flett Stream Tunnel East Oskondaga River Bridge
The Flett Stream Tunnel is located just west of the Flett Tunnel at Milepost 40.7/11.5.
Constructed in 1919 by the Carter-Halls-Aldinger Company of Winnipeg, the “stream tunnel” likely replaced an original wood trestle. The creek in area was rerouted and a 10 foot by 10 foot tunnel was bored through the solid rock to carry the waterway under the grade. The tunnel was part of a $86,897 contract awarded in 1918 that called for the replacement of previous wooden trestles with more permanent structures, such as the Strawberry Creek Trestle.
Flett Stream Tunnel
- Flett Stream Tunnel, October 2024.
- Flett Stream Tunnel, October 2024.
- Flett Stream Tunnel, October 2024.
- Flett Stream Tunnel, September 2024.
- Flett Stream Tunnel, September 2024.




