Video of the former Canadian Northern Railway/CN-Kinghorn (Dorion) Subdivision (MP 119.1-122.4) north of Nipigon, ON. Features 610-foot Nipigon River Bridge, originally constructed and completed circa 1913. It is the second longest structure on the line after the Blende River Viaduct (https://youtu.be/RW7mF35xBY0).
Part 3 of 6.
Active, 1914-2005.